The Old Bridge in Mostar

Year of construction: 1566
Technical data:
Span upstream 28,71 m
Span downstream 28,62 m
Width of the bridge 3,95 – 4,05 m
The number of stone blocks in the vault 459
Constant weight of the vault 90 cm
Weight of the bridge:
Vault 101,30 t
Fill 237,50 t
Lateral walls 40,52 t
Fence 10,46 t
Road surface construction, the road paved with cobblestones 25,76 t
Iron fence 1,29 t
Verticals 1,15 t
Truss bracing, slanted bars 0,18 t
Overall weight of the Old Bridge 417,16 t
The stone type out of which the Old Bridge
was made:
Tenelija (limestone)
The biggest treated blocks built in bridge
– size:
206 X 50 X 90 cm
The manner of linking of the stone blocks in the bridge - in every radial coupler as a link between the two adjacent layers have been mounted the metal - thorns- of wrought iron sizing 30 x 30 and 40 x 40 mm and having length 160-220 mm. The iron thorns have been mounted upwards to the coupler level and they have been cast with lead.

Restoration of the foundations, 1956
Restoration of the foundations, 1956

The great flood, 1959

  • The great flood
  • 1959

Works in the vault injection, 1963

  • Works in the vault injection
  • 1963

Restoration of the vault, the change of the damaged blocks upstream and in the vault, 1970

  • Restoration of the vault, the change of the damaged blocks upstream and in the vault
  • 1970

Investigation of foundations and the restoration works, 1981-1983

  • Investigation of foundations and the restoration works
  • 1981-1983

The day of destruction of Old Bridge, 1993-11-09

  • The day of destruction of Old Bridge
  • 1993-11-09

Decision to reconstruct Old Bridge, 1995-12-01

  • Decision to reconstruct Old Bridge
  • 1995-12-01

First donation to reconstruct Old Bridge, 1996-06-18

  • First donation to reconstruct Old Bridge
  • 1996-06-18

Workshop “Mostar 2004”, 1997-07-02

Taking out the first stone of Old Bridge from the Neretva, 1997-09-29

  • Taking out the first stone of Old Bridge from the Neretva
  • 1997-09-29

The last stone in the arch of Old Bridge taken out, 1997-11-21

  • The last stone in the arch of Old Bridge taken out
  • 1997-11-21

A UNESCO book on rehabilitation of Old Bridge and Old Town of Mostar published, 1997-11

  • A UNESCO book on rehabilitation of Old Bridge and Old Town of Mostar published
  • 1997-11
  • Application for recording in the World Building Heritage of UNESCO
  • 1998-06-25 – 1998-06-26

Cutting the first stone, 2000-12-11

  • Cutting the first stone
  • 2000-12-11

First stone put into the arch of Old Bridge, 2003-04-14

  • First stone put into the arch of Old Bridge
  • 2003-04-14

Last stone put in the arch of Old Bridge, 2003-08-22

  • Last stone put in the arch of Old Bridge
  • 2003-08-22

Ceremony of the opening of new Old Bridge, 2004-07-23

  • Ceremony of the opening of new Old Bridge
  • 2004-07-23

Arranged by Maja Cigić

This page

Description:

  • Appendix I – Important data about Old Bridge and significant dates in history of Old Bridge
  • Page – in full text version

Accesskeys:

  • s – Skip navigation

Last updated:

  • 2004-11-06

Copyright © 2004. Read about Copyright and Privacy.

Valid XHTML 1.0!